Ada, Volta River Delta, Ghana, July 2024, Provided consultancy during installation of 3 systems of 324 panels (113.500 Watt) photovoltaic - 414 kWh battery - 72 kW inverter power.
System details:
- 324 * 400 Watt solar panels
- 36 * 9,6 kWp Studer Variotrack MPPT 120/80 solar charge controller
- 20 * 240 Ah Cegasa LiFePo4 batteries (48 Volt)
- 9 * 8.000 Watt Studer Xtender charger-inverter
- 1 * Studer RCC Control monitor and controller system







|